Ben29
Structural
- Aug 7, 2014
- 326
I have a job where they want to add a second story to an existing single story house. The existing exterior bearing walls are 2x4. For strength, they really need 2x6 studs. Per IRC R602.3.4, studs shall have full bearing on a 2x plate, where the width of the plate is at least the width of the stud.
Is the only option to demo the existing 2x4 walls and build back new 2x6 walls? Is there anything wrong with scabbing on a 2"x 1 1/2" ripped board to the existing sill plate per image below?
Is the only option to demo the existing 2x4 walls and build back new 2x6 walls? Is there anything wrong with scabbing on a 2"x 1 1/2" ripped board to the existing sill plate per image below?