Dec 12, 2024 #1 Designer_82 Mechanical Joined Oct 17, 2020 Messages 63 Location US Should the elevator vendor size fused disconnect switch, Or should it be the project engineer of record, per your experience?
Should the elevator vendor size fused disconnect switch, Or should it be the project engineer of record, per your experience?
Dec 12, 2024 Moderator #2 waross Electrical Joined Jan 7, 2006 Messages 28,754 Location CA Sized by vendor, verified by project electrical engineer or contractor. (Due diligence.) Upvote 0 Downvote