May 12, 2006 #1 FAACRS Aerospace Joined May 12, 2006 Messages 3 Location US What are the shot peen requirements for 7178-T6511 after machining spar chord upper inbd fwd wing root of Boeing 727. And who can do this in the states.
What are the shot peen requirements for 7178-T6511 after machining spar chord upper inbd fwd wing root of Boeing 727. And who can do this in the states.
May 13, 2006 1 #2 debarra New member Joined Jul 11, 2003 Messages 11 Location ES Hi FAARS. Try this http://www.rosler.comThey are in Michigan Upvote 0 Downvote