Oct 29, 2002 #1 7775 Mechanical Joined Oct 18, 2002 Messages 2 Location US Can anyone tell me what would be a good rule of thumb for how many pounds a sheetmetal fabrication shop is capable of producing in an hour * with a coil line vs. 5x10 sheets