JROCK
Civil/Environmental
- Sep 20, 2002
- 1
HAS ANYONE HAD EXPERIENCE WTH OR PERFORMED COMPARATIVE VALUE ENGINEERING ANALYSIS BETWEEN DRILLED SHAFT "SECANT" PILE WALL VERSUS "JACKED" STEEL SHEET PILE WALL? BOTH HAVE TO GO 70FT AND SOILS APPEAR TO BE ACCEPTABLE TO EITHER METHOD.