Can gravity be used to move the parts? Are there surface finish issues to be managed? Are all parts similar in size/configuration? Are all presented to the brake in the same orientation? Do all leave the punch in the same orientation? Who/what picks up the part at the brake?
Each decision affects cost, time and space.
Griffy