abusementpark
Structural
For out-of-plane shear strength in reinforced CMU walls per ACI 530, does it matter if the shear is checked at a pour joint or not? It doesn't say anything. It seems like this would affect the shear strength.
For example, at the base of a cantilevered CMU wall, can I use the ACI 530 shear strength equations, even though you are only relying on friction and/or grout bond for shear strength?
For example, at the base of a cantilevered CMU wall, can I use the ACI 530 shear strength equations, even though you are only relying on friction and/or grout bond for shear strength?