Mar 24, 2005 #1 ravreyes1 Civil/Environmental Joined Mar 24, 2005 Messages 13 Location GB How to make a shear key in a reinforced concrete column and beam connection if the the column and beam are not poured at the same time?
How to make a shear key in a reinforced concrete column and beam connection if the the column and beam are not poured at the same time?
Mar 29, 2005 #2 StephenA Civil/Environmental Joined Nov 20, 2003 Messages 283 Location US Use a box out in the first one to be cast and include a access hole "letterbox" to make sure that the concrete fills the void. Box outs can be timber, expanded polystyrene or similar. Upvote 0 Downvote
Use a box out in the first one to be cast and include a access hole "letterbox" to make sure that the concrete fills the void. Box outs can be timber, expanded polystyrene or similar.