I have three tasks (A, B and C)and two resources (eng 1 and eng 2).
A and B requires 50 hour work each and are carried out by eng 1 and eng 2 respectively.
C requires 10 hour work and lasts until both A and B are completed. Eng 1 is assigned to this task.
No overwork/allocation permitted.
What is the way to work out the best schedule?
Thanks
Andrea
A and B requires 50 hour work each and are carried out by eng 1 and eng 2 respectively.
C requires 10 hour work and lasts until both A and B are completed. Eng 1 is assigned to this task.
No overwork/allocation permitted.
What is the way to work out the best schedule?
Thanks
Andrea