epoxybot one more thing. I like your cross-section of the 24's going through the mat extension but, while the design team has sometimes talked about "lifting" the NW corner, there is no way that the jacks are going the actually lift the building. The jacks are just to transfer load rather than to cause any movements. If anything moves it will be the 24-inch piles compressing and buckling rather than the building lifting. They have talked about the load transfer relieving the pressure on the OBC which, over time, might cause some rebound, which would lift the sand layer, the existing forest of concrete piles, the mat and the mat extension, which would cause relative movement of the 24's and the mat extension, but I don't know if that will actually happen. What will happen is that the south and east sides of the building will continue to settle. At what point that locks the 24's into the mat extension I don't know. One other thing, someone I know who talks to Jaxon van Derbeken at NBC Bay Area told me that Jaxon would like to talk to you. Not I think on camera but just because you have a lot of good information. Up to you whether you contact him or not.