F1955
Structural
- Oct 27, 2003
- 22
Where you are required to show the seismic design base shear on the drawings, should you show the total value or the diaphragm value? Thank you much.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.