P1ENG
Structural
- Aug 25, 2010
- 237
I have been asked to provide stamped calculations for a 10x40 (dimensions simplified for example) modular building that will be sat on top a 10-story building in LA county, CA. I don't know anything about the supporting building other than it is 100' to the roof line. Now, I am questioning my method for vertical distribution of seismic forces and calculation of wind pressures. The design is based on ASCE 7-05.
SEISMIC
Since I don't know the mass, period, or natural frequency of the supporting building I am assuming that the unit is located at grade. This is the same as thinking the supporting building has infinite mass and/or rigidity (as in: the earth) compared to my 10x40 building. I came up with this assumption after considering both methods in the attachment "Seismic Comparison". The highlighted information shows the changes between the two assumptions. (Ignore the overturning moments).
WIND
I am using Figure 6-6 for MWF and Figure 6-17 for C&C. C&C loads are straight forward. However, the MWF calculations brought up some questions. For the walls, I am conservatively using qz at the modular unit's roof elevation (110') and multiplying by G and Cp. Since MWF won't control over C&C, I am ignoring internal pressures since I am only concerned with the net lateral pressure on the walls. Now for my uncertainty. For the roof, I am assuming the value "h" is relative to grade and therefore is 110'. Also, "L" is a dimension of the supporting structure. Since "L" is unknown, I have to consider h/L < 0.5 and h/L > 1.0 (the roof of the modular has low roof pitch). Also, since I don't know "B" and "L" of the supporting roof, I must assume that the modular unit is within h/2 from the windward edge of the supporting roof. Therefore, I must use the worst case Cp assuming h/L equal to 0.5 and 1.0 with applicable reduction due to modular unit roof area (400 ft^2).
I also initially thought the modular unit could be considered rooftop equipment, but I have since changed my mind. Equipment is considered rigid and used to obtain base shears for anchorage. The modular unit is structural and can't be assumed to be rigid.
Finally, the modular unit is only 1-story but will be placed on a 10-story building. Any opinions as to whether I will need an SE to stamp this or if a Civil PE will suffice.
Any thoughts on this?
Juston Fluckey, E.I.
Engineering Consultant
SEISMIC
Since I don't know the mass, period, or natural frequency of the supporting building I am assuming that the unit is located at grade. This is the same as thinking the supporting building has infinite mass and/or rigidity (as in: the earth) compared to my 10x40 building. I came up with this assumption after considering both methods in the attachment "Seismic Comparison". The highlighted information shows the changes between the two assumptions. (Ignore the overturning moments).
WIND
I am using Figure 6-6 for MWF and Figure 6-17 for C&C. C&C loads are straight forward. However, the MWF calculations brought up some questions. For the walls, I am conservatively using qz at the modular unit's roof elevation (110') and multiplying by G and Cp. Since MWF won't control over C&C, I am ignoring internal pressures since I am only concerned with the net lateral pressure on the walls. Now for my uncertainty. For the roof, I am assuming the value "h" is relative to grade and therefore is 110'. Also, "L" is a dimension of the supporting structure. Since "L" is unknown, I have to consider h/L < 0.5 and h/L > 1.0 (the roof of the modular has low roof pitch). Also, since I don't know "B" and "L" of the supporting roof, I must assume that the modular unit is within h/2 from the windward edge of the supporting roof. Therefore, I must use the worst case Cp assuming h/L equal to 0.5 and 1.0 with applicable reduction due to modular unit roof area (400 ft^2).
I also initially thought the modular unit could be considered rooftop equipment, but I have since changed my mind. Equipment is considered rigid and used to obtain base shears for anchorage. The modular unit is structural and can't be assumed to be rigid.
Finally, the modular unit is only 1-story but will be placed on a 10-story building. Any opinions as to whether I will need an SE to stamp this or if a Civil PE will suffice.
Any thoughts on this?
Juston Fluckey, E.I.
Engineering Consultant