note that hand excavation is probably not possible for 600mm, 800 - 900 is generally the limit
a square tunnel is possible but probably not feasible, a round steel casing with a carrier pipe inside is a much better design.
main issues to address:
groundwater and dewatering if necessary
affect of water level or lowering of water level on stability of the face and pit walls
existing trenches / utility lines above the tunnel
leaking sewer lines above
allowable settlement so as to not affect everything above
rock, cobbles, boulders and sand or other layers crossed besides just the clay
shoring of jacking and receiving pits
length of jack / cohesion of material / calculation of the jacking force
determine the allowable length between jacking, intermediate stations and receiving pits
design of the foundation and thrust wall for the hydraulic jack
earth load on the pipe
jacking force on the pipe
design of thrust ring
need for mud or grout?
earth load on the jacking shield
what type of shield
slope stability at the face of excavation
removal of material, slurry pipeline, auger, buggies, buckets
curved or straight alignment, tolerance on line and grade