zahid106
Civil/Environmental
- Nov 3, 2000
- 16
I have a phased development with a regional detention basin. The drainage area for regional detention basin is 36 acres. Twenty six acres of the drainage area are developed. we are in the last phase of this project and working on the developing 10 remaining acres. City is requiring a sedimentation basin. we would like to use this regional basin as temporary sedimentation basin. The basin needs to remain operational for developed areas. Any ideas / experience with how to do that.