Erik B
Civil/Environmental
- Sep 14, 2017
- 1
I have a situation where I am trying to determine the offsite flow onto our site by modeling the detention pond upstream since no calculations are available. The pond in question has two modified outlet structures at different elevations working in tandem. How do I model a secondary outlet with device restrictions? Is it possible?