Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Second Layer Reroof Less than 3 psf Procedure

waytsh

Structural
Joined
Jun 10, 2004
Messages
385
Location
US
I have a client that would like to perform a metal over metal reroof on an existing commercial steel building. The second layer of roof is less than 3 psf. IEBC grants an exception when the second layer of reroof is less than 3 psf, but what exactly does this mean? Does this mean that they don't need to involve a structural engineer and can just proceed with the reroof ? Does it mean that a full scale investigation of the building is not required to ensure that it complies with the current code but an engineer should still do a visual inspection of the building to make sure everything looks sound? Curious how you all are handling these situations.

Thanks!
 

Part and Inventory Search

Sponsor

Back
Top