why 200 year? I have only seen storms larger than 200-year used for analysis of Corps levees and dams. Levee design (except for interior drainage) is generally based on river flows, not on a storm runoff analysis. For the dams, typically the PMF which probably does not use the SCS Type I storm.
By the way, it is more likely that a type II or type III storm would be used for a 200-year analysis.