I have an equipment foundation that is subject to sliding. The soil below is Sandy Silt with a low angle of internal friction (13°). Would the better recomendation ground improvements be a structural fill, or could cement stablization be used here? This work is being done overseas and I am not sure yet what is available for site improvements.