Thanks for your reply. I really did not think this through before posting the question. I am the designer of this plant, which is a new plant at an existing site. 380 V, 3 phase, 50 Hz comes into this site now, but we need to add more power, and a new motor control center is needed. The larger motors will be 380 V, 3 phase, but these three metering pumps are small. The lowest bids I have are 220 V, 3 phase if manual but 220 V, single phase if electronically controlled. My plan is two pumps electronically controlled and one manual.