I have a project that is in design phase that includes paralleled 12.47kV diesel generators feeding a medium voltage distribution system. I am planning to specify a high resistance ground (HRG) for the generators. I understand that the let through current of the HRG must be equal to or greater than the system charging current. How do I estimate the system charging current for the system? Are there any proven rules of thumb for calculating charging current for a 12.47kV distribution system?
The calculated demand load is approximately 15 MVA. The generators are feeding (16) 2500 kVA liquid insulated substation transformers.
The calculated demand load is approximately 15 MVA. The generators are feeding (16) 2500 kVA liquid insulated substation transformers.