Cmbyrd:
I’d be tempted to use parallel chord wood (steel) trusses, with bot. chord just above the suspended clg., and top chord at whatever elev. calced. depth required, defining the floor of the platform. Sheath this top chord out to the exterior walls for your primary diaphragm. The sloped part of the roof would just be mono trusses which included most of the framing for the eave/soffit overhangs. The mono trusses sit on the primary deck, either matching some lower trusses or crossing others. The bot. of the steel beams would be about at the same elev. as the bot. chord of the wood trusses. Then the wood trusses would be top bearing on the steel beams, and tied together across the beams. Then you do something like Woodman88 suggested to tie the roof diaphragm and the main diaphragm together by sheathing the vert. walls around the platform.