1 2 3 4 5
RBI---->PHA--->PSM--->RMP--->HSE MS
1. API 581 & 581
API 1129 & 1169
API 752
2. ISO BS EN 17776, API 770, BS EN 1050
3. OSHA CFR 29
4. EPA CFR 40 Pt. 68 & API 760 & 761
5. ISO 14000 & API 50
ISO 18000, API 75, API 2220 & 2221
API 9000, 9100 A & B
Note:
I cannot stress enough how important it is to read OSHA 3133; it would reflect alot towards your inquiry and will ensure you grasp the entire picture. Risk must be evaluated comprehensively in line with the Process Information and accordingly addressed in the relevant system procedures; such as:
Design + *,
Manufacturing + *,
Construction + *,
Commissioning + *,
Operation + *,
Shutdown + *,
Maintenance/Inspection + *,
Start-Up + *,
* : Training or Prequalification of Contractors/
Manufacturers
With the following barriers,that ensure the consistency and adquacy of the system procedures:
Audits,
Emergency Prepardness,
Management of Change,
The above three items proof the risk assessment.
Risk Assessment --> Process Hazard Analysis
HAZID/HAZOP/FTA/FMEA/FMEAC/ETA/QRA/SIL/PVM etc etc
Cheers