Tstover
Mechanical
- Feb 6, 2007
- 29
My company list detailed revisions on drawings in a format like:
c 5/05/07 9058 was 9500354 TS
B 9/08/02 8535 changes per pilot run CF
A 4/06/99 5536 release for production SL
What would be the best way to automatically update every drawing (revision list) effected by the revision and automatically list the roll the revision letters forward?
c 5/05/07 9058 was 9500354 TS
B 9/08/02 8535 changes per pilot run CF
A 4/06/99 5536 release for production SL
What would be the best way to automatically update every drawing (revision list) effected by the revision and automatically list the roll the revision letters forward?