Enhineyero
Structural
Hi all. Does anybody know if there is a code restriction regarding re-construction of a RC beam. For example i have a RC beam carrying roof trusses, but the owner wanted to renovate the house and install a RC slab instead of a steel trusses. lets say the existing RC columns and Beams are adequate to carry the change in load (also no seismic load is req'd, the governing load is gravity loads).
Now the existing beam will have to carry the new slab. Can i partially remove the top concrete of the beam and recast it together with the new slab (existing beam and new slab will have the same grade of concrete and the existing rebars will not be removed or touched)? or is there something in the ACI or Euro code that will prevent me from doing this.
thanks for any information
Now the existing beam will have to carry the new slab. Can i partially remove the top concrete of the beam and recast it together with the new slab (existing beam and new slab will have the same grade of concrete and the existing rebars will not be removed or touched)? or is there something in the ACI or Euro code that will prevent me from doing this.
thanks for any information