One design firm that I worked for had had a policy to design retaining walls for undrained/saturated condition, even if a drain was shown on the drawings. I was told that the reason behind that was the fact that the drain may get clogged and, with rain or high water table, the soil may be saturated.
Is this a common practice to simply ignore the drain?
Is this a common practice to simply ignore the drain?