charlierock
Geotechnical
- Dec 23, 2002
- 12
I am a soils engineer who has never worked in a seismic zone 4 before. I now have a project in zone 4 which has some retaining walls to 10 feet high. For granular retaining wall backfill, I generally give an active pressure value of 30 pcf for level backfill and increase that value for sloping backfill. Will these pressures increase during a seismic event and how do I calculate the new pressures due to the seismic load?