When placing rebar for vertical members, is a contact lap splice always required? Is there a tolerance on this? I have already read ACI-117 section 2.2, but have not fully understood all of the various points therein and will cogitate upon them with guidance.

When placing pre-tied column cages on the dowels of the previous lift sometimes the dowels may have been sqoze in a little too tightly and now there is a couple of inches between the dowels and the verts of the new cage. Or a section of pre-tied wall resteel the dowels may be off a little from the verts of the section be flown in.

All vertical bars require a full contact lap splice or is there a tolerance for distance between the these bars? And if yes on the tolerance what part of ACI-117 2.2 tells me this?
 
Replies continue below

Recommended for you

ACI 318-05 12.14.2.3 gives maximum distance between non contact lap splice bars.
 
The maximum distance between non-contact lap slpices for beams are the same for walls and columns?
 
All vertical bars require a full contact lap splice or is there a tolerance for distance between the these bars? And if yes on the tolerance what part of ACI-117 2.2 or ACI-318 tells me this?

Am surprised I can't get an answer on this.

Is it a dumb question? A no brain-er? There are no dumb questions but there sure are a lot of inquisitive idiots running around!
 