Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Required manpower and equipment to construct 50 km CS oil UG pipeline 2

Status
Not open for further replies.

Jas81

Civil/Environmental
Joined
Aug 19, 2018
Messages
3
Location
DZ
Hi:
I have a tender to construct 50 km CS oil UG pipeline, 8", the soil is sand
the construction period starting from ROW till hydrotesting is 12 months
I am preparing the level 1 of the plan along with manpower and equipment plan
Can you please help me in this matter
I prepared the construction steps as following:
Route Survey--ROW--Excavation--Stringing--Welding--NDT--Coating--Lowering--First Backfilling--HT--Final Backfilling
can you help me in preparing the manpower and equip,emt plan in details and with numbers

Thanks
 
This isn't a site for free engineering.

I normally get paid for that information.

Not sure you should be tendering for something and be asking for this sort of Information.....

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
 