bnovak
Chemical
- May 23, 2006
- 2
I have 2 separate 5,000 gallon reactors each fitted with their own rupture disk (no PSV), but tie into the same relief header. They’re (the RDs) stamped with 82 psig @ 72 F. Doing a quick calculation (assuming only water in the reactor) gives me around a 2-2.5” required area and around 30,000 lb/hr capacity (?)(fire case). Both of these relief lines go 20’ out from the reactor with 2” lines, then connect at a “T” and continue another 100’ in a 2” line before emptying into an open-top tank. How can I go about determining whether or not the “T” is OK, or if I should break it and run 2 separate 2” lines out to the tank?