Hi, I have a problem with Abaqus/CAE.
I have simple two element beam (in othes software (example Sap2000) I can define a releases, between end Node beam 1, and start node beam 2, for example to add and internal hinge.
is It possible with abaqus/CAE? if yes how?
this is the simple system:
Thanks in advance
I have simple two element beam (in othes software (example Sap2000) I can define a releases, between end Node beam 1, and start node beam 2, for example to add and internal hinge.
is It possible with abaqus/CAE? if yes how?
this is the simple system:
Thanks in advance