roadspecialist
Civil/Environmental
- Jan 7, 2004
- 11
the existing overflow type dam for an irrigation project spans 30m across the waterway with a height of 6m.
built without an apron slab on the downstream side, the dam is undermined and is hanging supported only by the abutments on both banks.
any suggestions on how to rehabilitate.
will filling up the gap under the existing dam be sufficient.any suggestions?
built without an apron slab on the downstream side, the dam is undermined and is hanging supported only by the abutments on both banks.
any suggestions on how to rehabilitate.
will filling up the gap under the existing dam be sufficient.any suggestions?