pob11646
Structural
- Mar 8, 2009
- 35
I have got a question about concrete development length, and whether I can reduce the development length if the tension in my steel is less than the maximum tension that my steel reinforcement can take. Reference is ACI 318-05
Section 15.6.2 - "Calculated tension or compression in reinforcement at each section shall be developed on each
side of that section by embedment length, hook (tnesion only) or mechanical device, or a combination thereof.
Say the tension in my steel bar is only 37% of the full tensile capacity of the bar. Is it right to say that my
development length for that particular bar can only be 37%, esp. if I have no space to develop my length further?
Thanks.
Section 15.6.2 - "Calculated tension or compression in reinforcement at each section shall be developed on each
side of that section by embedment length, hook (tnesion only) or mechanical device, or a combination thereof.
Say the tension in my steel bar is only 37% of the full tensile capacity of the bar. Is it right to say that my
development length for that particular bar can only be 37%, esp. if I have no space to develop my length further?
Thanks.