AUCE98
Structural
- Nov 24, 2004
- 127
I am looking for a reference that may provide some guidance for live load of a recycling facility floor. At this point we are estimating that the controlling factor for thickness of the slab will be a wheel load of front end loader of an undetermined capacity. My initial guess is 400-500 psf and a slab thickness of 6-8 inches. Any assistance would be appreciated.
Regards,
AUCE98