if you work for oil and gas, these horizonatal and vertical forces are calculated by piping stress using i believe ceasar software.
although pipe full of water are assumed sometimes as test loads, which is just pipe weight plus water weight.
we do add thermal friction as horizontal forces, 30% operating loads for pipe rack or pipe support design aside from thermal anchor forces from piping stress.