kauaiboi04
Structural
- Mar 8, 2012
- 3
I am working on a project that includes a 5 story steel (moment frame) building over 2 levels of concrete parking. I have modeled the steel building in Ram and the concrete portion in Ram and then transferred to Concept. I designed my intermediate slab which is a typical 2 way concrete slab. I am now working on the 1st level which has concrete beams to resist the moments at the bases of the steel moment frames and a standard 2 way slab everywhere else. I was getting unusually high top and bottom steel requirements when looking at this level and started to troubleshoot. I found that when I ran the D+L combos the results were very typical, but the combos which include E seem to add 100 +/- top and bottom bars to each design strip. Has anyone ran into this problem? Any help would be appreciated. Thank you
Billy
Billy