We have 3 1/2" LWC on 3" composite metal deck (total 6 1/2" thick), spans 11'-0" , total load 110 psf. The owner wants to install 1/2" plastic pipes at 9" o.c. in the structural slab. The pipes run parallel and perp. to deck in a serpentine fashion.
ACI 302 - Guide for concrete floor slab construction requires 2" concrete cover under the pipe and 2" to 3" cover over the pipe.
I have never done in-floor radiant heating.
Any help would be appreciated.
We have 3 1/2" LWC on 3" composite metal deck (total 6 1/2" thick), spans 11'-0" , total load 110 psf. The owner wants to install 1/2" plastic pipes at 9" o.c. in the structural slab. The pipes run parallel and perp. to deck in a serpentine fashion.
ACI 302 - Guide for concrete floor slab construction requires 2" concrete cover under the pipe and 2" to 3" cover over the pipe.
I have never done in-floor radiant heating.
Any help would be appreciated.