- 3
Being design engineer for a 3 storey R.C building, I requested concrete cores to be tested for base and column upon suspecting column quality from ground to first floor level. Results were surprising, getting only 50% of specified strength. 2 floors have been built supported by this colum & base.
What procedure can I use for remedial work?