The Code recognizes a manufacturer or contractor as
the organization which has responsible operational control
of the production of the weldments to be made in accordance
with this Code. If in an organization effective operational
control of welding procedure qualification for two
or more companies of different names exists, the companies
involved shall describe in their Quality Control
system/Quality Assurance Program, the operational control
of procedure qualifications. In this case separate welding
procedure qualifications are not required, provided all other
requirements of Section IX are met.
Nasir
Welding Engineer
DESCON ENGINEERING LIMITED
PAKISTAN