By Y14.5M multiple composite positional tolerance feature control frames (ptcf) by default create separate requirements even if the datums are in the same order. If there are 'N' ptcfs then there are 'N' separate requirements. For example, a four-hole pattern of .106 diameter holes controlled with a composite ptfcf utilizing A/B/C in the top line and A in the bottom line. Next, consider if there were another pattern of, say, ten .250 diameter holes in the same part having its own ptfcf where A/B/C is also in the top line and A is in the bottom line.
By default, these two requirements are SEPARATE (the note SEPARATE is not needed) indicating that the two hole patterns are independant (and probably do not mate to the same part). If the ptfcfs were not composite but instead possessed a single line then the requirements would be SIMULTANEOUS by default.
In the composite case, if you don't want the requirements to be separate, then the placement of the note SIMULTANEOUS under either ptfcf overrides the SEPARATE default and makes the requirements simultaneous.
Tunalover