Hello Engineers,
I have been working on secant pile drilled shaft project and now i'm at the lateral analysis design stage, using LPILE.
As you may know, LPILE allows you to enter a section and compare its maximun bending moment with the maximum moment you get from your soil profile.
In order to compare both values, I was told I need to amplify my maximum moment I get from my soil profile by a factor of 1.75. I am not sure if this factor varies between project (e.g Secant pile wall, or deep foundation). I just would like to know where can i get more information about this amplification factor.
If anyone knows, please let me know.
Thanks
I have been working on secant pile drilled shaft project and now i'm at the lateral analysis design stage, using LPILE.
As you may know, LPILE allows you to enter a section and compare its maximun bending moment with the maximum moment you get from your soil profile.
In order to compare both values, I was told I need to amplify my maximum moment I get from my soil profile by a factor of 1.75. I am not sure if this factor varies between project (e.g Secant pile wall, or deep foundation). I just would like to know where can i get more information about this amplification factor.
If anyone knows, please let me know.
Thanks