Mar 5, 2007 #1 emrekop Industrial Joined Dec 10, 2006 Messages 11 Location TR Hii everyone...in ASME sec9, part QW423, a welder qualified with P no=1 can weld P No 1 to 11 ...does this include p no's 5A and 5B...thanks
Hii everyone...in ASME sec9, part QW423, a welder qualified with P no=1 can weld P No 1 to 11 ...does this include p no's 5A and 5B...thanks
Mar 5, 2007 1 #2 metengr Materials Joined Oct 2, 2003 Messages 15,478 Location US Yes. Upvote 0 Downvote
Mar 5, 2007 #3 lostsailor Structural Joined May 10, 2004 Messages 149 Location US emrekop, Be careful, base metal substitution can only be done if all other essential variables in the WPS/PQR being used remain the same. I've seen this paragraph misapplied more than once. Regards, RLS Upvote 0 Downvote
emrekop, Be careful, base metal substitution can only be done if all other essential variables in the WPS/PQR being used remain the same. I've seen this paragraph misapplied more than once. Regards, RLS