virjil
Mechanical
- Jun 13, 2003
- 13
We have an exchanger that we will install an additional drain nozzle. According to construction drawing, all welds must be PWHT'd. There is a required reinforcement pad on this nozzle. What is the accepted PWHT sequence? PWHT first the nozzle weld to the shell then PWHT again after welding the reinforcing pad? Or PWHT of the nozzle weld will be sufficient? Shall I PWHT with the pad on?