psychedomination
Structural
Hi all I assume this is a very simple question. I need to install some PVC hand rails onto an existing dock as a replacement for some handrails that have corroded.
I need some help with how to go about anchoring them down.
My methodology so far is that I will fill the PVC with concrete and either two rebar or one rebar depending on the spacing and also use hilti epoxy to anchor the rebar down into the existing concrete.
However, Do I need to cut out the existing concrete to anchor the pvc pipe down ( I am assuming this would be the method I should take) or can I just drill into the existing concrete and put the hilti in that (directly on top of the existing concrete)? If I do need to cut out the existing concrete, how do I go about determining the depth required?
Photos of thoughts attached.
I appreciate any assistance you can provide
I need some help with how to go about anchoring them down.
My methodology so far is that I will fill the PVC with concrete and either two rebar or one rebar depending on the spacing and also use hilti epoxy to anchor the rebar down into the existing concrete.
However, Do I need to cut out the existing concrete to anchor the pvc pipe down ( I am assuming this would be the method I should take) or can I just drill into the existing concrete and put the hilti in that (directly on top of the existing concrete)? If I do need to cut out the existing concrete, how do I go about determining the depth required?
Photos of thoughts attached.
I appreciate any assistance you can provide