sharp910sh
Civil/Environmental
I have pile cap, huge pile cap 88.4m by 28.4m 7m deep. 28 2.5m diameter piles at 7.5 m spacing. the 1.5d perimeter encloses 4 piles! does that mean i include the 4 pile loads in the punching shear check. or should i just include the one pile, and the shear stress at 1.5d is just due to the single pile. in reality that isn't the case. the shear stress at 1.5d perimeter will be due to whatever is within the 1.5d, i.e the 4 piles inside the perimeter.
hmmmm
any ideas guys?
hmmmm
any ideas guys?