shacked
Structural
- Aug 6, 2007
- 182
I am a one man shop, and within the past year have been on my own working out of my house doing Residential Structural. So far everything has went well, but now I have been contacted by a solar contractor to provide engineering for a site retaining wall behind a family owned business. Yesterday I met the Business owner and contractor at the site and reviewed the project scope. After the meeting the contractor and I went over a few issues and I told him that I will provide a proposal directly to the owner of the property. He pauses and says that he was already hired by the owner and part of his contract was to pay for the Engineering services and that I should provide a proposal for engineering services directly to the contractor and not the owner.
This is something that I have not done before since I like to have the contract directly with the owner. This is because if I do not get paid I can always file a lien on his property until I get paid, but if I have the contract directly between myself and the contractor I have less leverage.
Have any of you guys experienced something like this, or whom do you typically make the contract with, owner or contractor or does it matter?
Thanks
This is something that I have not done before since I like to have the contract directly with the owner. This is because if I do not get paid I can always file a lien on his property until I get paid, but if I have the contract directly between myself and the contractor I have less leverage.
Have any of you guys experienced something like this, or whom do you typically make the contract with, owner or contractor or does it matter?
Thanks