yacobyishak
Civil/Environmental
- Dec 21, 2011
- 2
I am going to observe as a building construction inspector the cut that is going to be done in the near future for a parking lot. I was instructed to perform a proof rolling on the cut. I thought you were supposed to do proof rolling to see if there was either a rut or pumping before you do the compaction test using a nuclear guage. Do you need to perform a proof roll observation on a cut?