rwa
Mechanical
- Dec 18, 2006
- 1
Hi,
i am currenlty looking to find an acceptable Proof Load for an offshore lifting application. the lifting engineers handbook refers to International Labours Organisation (ILO) and has a proof load (for 50t) = SWL * 1.04 + 9.6t. Does this value include dynamic Aplication factor for offshore? Is this a sutiable industry standard?
i am currenlty looking to find an acceptable Proof Load for an offshore lifting application. the lifting engineers handbook refers to International Labours Organisation (ILO) and has a proof load (for 50t) = SWL * 1.04 + 9.6t. Does this value include dynamic Aplication factor for offshore? Is this a sutiable industry standard?