Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Profile Control of Datum

Status
Not open for further replies.

JLang17

Electrical
Jan 16, 2009
90

Please see the attached drawing.

I am using ASME Y14.5-2009, I think the '94 version would have "two surfaces" in place of my "2x", but anyway...

Profile of a surface requires the true profile to be established with basic dimensions. I can't find anything in the standard that overrides this rule when the surface is a datum as I have shown. I don't want the .500 width to be basic, I just want those 2 edges to be within .005 and to establish datum B.

Is it acceptable the way I have it?
 
Replies continue below

Recommended for you

For whatever reason, the back edges of the tabs are missing. The .500 dimension is the width of the tab.
 
I'm only familiar with -94 so can't say about the 2X and it's difficult to be sure as some of the lines & dimensions are missing but I think this is OK.

There are some very explicit examples in the 94 standard for using surface profile to control coplanarity and even as setting that as a datum. I'd assume 09 is the same so take another look if you haven't already.

You're setting the 'under side' of the tabs as your B datum. The .500 doesn't come into making the datum or not. The .500 (should maybe be 2X) is locating the top edge of the tab from datum B.

All other features in that orientation should be dimensioned (directly or indirectly) from B unless you have something funny going on.

KENAT,

Have you reminded yourself of faq731-376 recently, or taken a look at posting policies: What is Engineering anyway: faq1088-1484
 
Paul, I'm sorry but I don't find your sketch a clarification, if anything it's more confusing to me.

JLang's repost appears pretty clear to me, very similar to figure 6-20 in the 94 spec. The phantom line makes it clear which 2 surfaces it applies to, although there should be a break between the phantom line & the geometry line.

I'm not sure about the "2X" but the OP implies this is a 2009 thing.

KENAT,

Have you reminded yourself of faq731-376 recently, or taken a look at posting policies: What is Engineering anyway: faq1088-1484
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor