1
- #1
TWong
Mechanical
- Nov 21, 2000
- 37
In the changing mindsets discussion, I have realized that I cannot change certain people due to money, ego's, or just plain unwillingness to change. Looking at my own situation, I have begun to document certain aspects of my job for my own benefit. We currently have no good system for releasing production to the shop floor. I now have a book of jobs that include the customer specs, the BOM, drawings and work instructions. As I am given these jobs, I keep adding to my book. Eventually I hope to have a complete log of all possible combinations and thereby make our company more efficient at this particular aspect of our production.
I chose this route because I could not convince my superiors to invest in good MRP system that would track these items for us. What they have purchased in a good accounting system with very little ability on the manufacturing side. Excellent payroll, AP and AR abilities, but little on the forecasting and BOM side. When this oversite was discovered, the software company decided to scramble and put together a MRP package for us. That smacks of debugging problems for a year or two. I will still maintain my system as a control of sorts, we will be calling it the Engineering BOM as opposed to the BOM in the system which can be affected by order quantities, variances, and other elements not really needed by engineering.
Question: Is this an acceptable alternative to stubborn mindsets? Or am I doing double work? Tommy
I chose this route because I could not convince my superiors to invest in good MRP system that would track these items for us. What they have purchased in a good accounting system with very little ability on the manufacturing side. Excellent payroll, AP and AR abilities, but little on the forecasting and BOM side. When this oversite was discovered, the software company decided to scramble and put together a MRP package for us. That smacks of debugging problems for a year or two. I will still maintain my system as a control of sorts, we will be calling it the Engineering BOM as opposed to the BOM in the system which can be affected by order quantities, variances, and other elements not really needed by engineering.
Question: Is this an acceptable alternative to stubborn mindsets? Or am I doing double work? Tommy