We constructed an "on" ramp which did not have enough super elevation as the ramp rotated. That discovery was detected after the ramp was completed. Although the heavy structural steel components had been assembled entirely at the fabrication plant and conformed to the design requirements for curvature, elevation etc..., somehow the third party designing firm had made a mistake which was discovered when the ramp was completed with parapets and pavement, railings etc... Nonetheless, the state DOT suggested that we load the ramp with truck cranes for a specified amount of time to detect any further flaws. DOT was satisfy with such a load tests however the life span of the ramp was reduced.